

Published: 10-02-2011
Summary of tasks and relevant vat percentages
For the following work 25% applies to the labour costs:
Facade and roof
• Replacement of balustrades of corridors and balconies
• Glazing (replacing glass)
Installations
• installation of smoke detectors
• installation and removal of solar water heaters
• replacement and installation of central heating systems (incl. removal of water heaters, modification of an existing gas connection, new radiators, installation of a thermostatic valve and foot valve, new pipework for radiators.
• the conversion of individual heat to collective heat through third parties by apartment complexes (incl. regulator for district heating, room thermostat on/off, connecting thermostat, dismantling and disposing of old boiler with accessories, standard VR boiler, removal and disposal of kitchen water heater, standard kitchen water heater, hot and cold water, insulation thermaflex, fittings and other materials, wall faucets.
For the following work 30% applies to the labour costs:
Facade and roof
• replacement moving parts of exterior doors
• replacement hardware windows (outside) and exterior doors
For the following work 40% applies to the labour costs:
Facade and roof
• replacement exterior frames (windows and doors)
• replacement window sill/water hose etc.)
Interior upgrades
• bathroom renovation (if included removing plumbing, wall tiles, floor tiles, installation of new plumbing, wall tiles and floor tiles, adjusting pipes, electrical and structural equipment)
• kitchen renovation (incl. removal of kitchen and wall tiles, installation of wall tiles and kitchen, adjustment of pipes, adjustment of electrical work and restoring washing machine connection etc.) NB: this does not include the one-time installation of a kitchen.
Installations
• restoration/replacement sockets and switches
For the following work 55% applies to the labour costs:
Facade and roof
• restoration facade masonry work
• restoration crack forming inner cavity
• insulation and hydrophobisation
• restoration concrete work
• replacement and unblocking rainwater drainage
• scaffolding
• facade plaster work
Corridors and balconies
• restoration corridor floors, balconies and balustrades
Flat roofs
• replacement and restoration
Pitched roofs
• enhancements and restoration
• new roof finish
• new roof windows
• new dormer
• replacement roofing on site
• replacement skylights
Interior upgrades
• insulation ground floor
• toilet renovation
• installation interior walls
• replacement interior frames
• restoration and replacement of stairs and ramps
• interior wall finishes
• plaster finishes
• ceramic finishes (wall tiles and floor tiles)
• floor finishes (under and covering floors) and ceiling finishes
Installations
• installation air conditioning
• replacement cupboards
• replacement electrical wiring in house
• installation fire alarms
• installation of new radiators without replacing boiler (incl. removal of radiators and new pipe work for radiators)
For the following work 80% applies to the labour costs:
Facade and roof
• surface finish (grout work and demolition)
• restoration chimney brick
NB: there is no agreement made on the rate of labour/materials by (total) renovations or other activities and services than mentioned above. This allows the provider of the work themselves to determine the percentage. It is important that the estimate of the labour in the fulfilment of the contract is established. This concerns contracts with an agreed fixed sum.
Keep up to date with the latest tax developments in the Netherlands.
Follow us on twitter or become a fan of our Facebook page.
06-04-2012
28-02-2012
23-02-2012
11-01-2012
19-10-2011
28-07-2011
20-06-2011
06-06-2011
09-05-2011
23-03-2011
07-05-2012
27-04-2012
24-04-2012
11-04-2012
15-03-2012
14-03-2012
01-03-2012
29-02-2012
13-02-2012
02-02-2012
01-02-2012
31-01-2012
27-01-2012
20-01-2012
12-01-2012
05-01-2012
16-12-2011
14-12-2011
08-12-2011
02-12-2011
23-11-2011
16-11-2011
13-11-2011
10-11-2011
19-10-2011
13-10-2011
21-09-2011
10-09-2011
08-09-2011
05-09-2011
30-08-2011
26-08-2011
25-08-2011
20-08-2011
18-08-2011
01-08-2011
28-07-2011
14-07-2011
12-07-2011
04-07-2011
20-06-2011
27-05-2011
19-05-2011
17-05-2011
13-05-2011
09-05-2011
07-05-2011
06-05-2011
04-05-2011
03-05-2011